All projects

Residential project · Buenos Aires, Argentina

Torre Pergamino

Pergamino 160, Flores, CABA

Developer

Proyecto Zero

Profile reviewed

October 3, 2026

Enquiries coming soon
Total apartments in the project
89

Project specifications, not units available for purchase.

No current price published in the reviewed sources.

Current availability has not been confirmed.

Project brief

The project

The programme at Pergamino 160 in Flores, Buenos Aires, lists 89 homes: 45 studios, 34 two-room and 10 three-room apartments. Room labels are not bedroom counts. Its main programme describes thirteen upper floors plus two basements, ground floor and a green terrace, while metadata lists fifteen floors. These remain distinct published scope statements rather than a reconciled floor total. Parking statements of 93 private spaces versus 100 covered/uncovered spaces remain unresolved, without choosing a capacity or inferring ownership categories. Listed shared spaces include a pool with showers, garden, children’s space, gathering room with kitchen, barbecue, shared laundry and green terrace. Vehicle lifts, central hot water, two passenger lifts and air-conditioning provisions are recorded, without confirmation of completion, possession or current availability.

Profile reviewed
October 3, 2026

Amenities

  • Pool with showers
  • Garden
  • Children’s space
  • Gathering room with kitchen
  • Barbecue
  • Shared laundry
  • Green terrace

Design & finishes

  • Vehicle lifts
  • Central hot water
  • Two passenger lifts
  • Air-conditioning provisions

Planned unit mix

  • Eighty-nine homes: 45 studios, 34 two-room and 10 three-room apartments; rooms not bedrooms.
  • Body thirteen upper floors plus two basements/ground/green terrace, metadata fifteen floors. Parking93private versus100covered/uncovered remains unreconciled, not an exact chosen count.

Location

Pergamino 160, Flores, CABA

Evidence

Sources behind this profile

A source proves only the fact it supports. It does not establish investment quality, future performance, or current availability beyond the observation date.

  1. 01

    Torre Pergamino — project specifications

    Project page · observed September 25, 2026

    Open source

Continue researching

Related projects

Browse all projects

Independent project research

Put Torre Pergamino in context.

Enquiries coming soon